06 / Proven Outcomes
Defensible numbers tested by production reality.
Review our track record across complex reservoirs, debt structuring, and brownfield asset revitalisation.
Field RedevelopmentLatin America Foreland Basin
Mature Sandstone Reservoir Life Extension
Engineered an integrated waterflood pattern realignment combined with selective perforations across bypassed pay, delivering payback within 4.5 months.
+3,400 BOPD
Incremental Production
Investor Technical DDDeepwater Shelf Analog
$180M Senior Debt Facility Underwriting
Uncovered structural compartmentalisation risks obscured in the initial data room, enabling our private credit client to restructure collateral terms safely.
-$42M Risk Mitigated
Identified Liabilities
Hydraulics & Flow AssuranceOffshore Platform Complex
Subsea Gathering Network Debottlenecking
Dynamic multiphase network simulation identified critical slugging bottlenecks, resolved via optimized topside backpressure valve sequencing.
+18% Flow Rate
Throughput Expansion
Have a similar field development challenge?
Every asset has latent upside. Let us review your production logs and decline trajectories.
Discuss Your Asset